Laying Rebar Flooring

Now that the old floor was completely dug out and the waterproof membrane installed, it was time to “rebuild” the floor.  First they covered over the rubber membrane with a plastic interlocking “wall-to-wall” tile.  This is the first step in constructing a structured flooring system.   Then a wired grid is laid on top of that for rigid support.  

On top of that, they pour a 6″ layer of concrete.  Since the work is being done inside a house, each bit of concrete had to be manually brought in by the wheelbarrow full and shoveled onto the surface.  A very labor-intensive process that took about a week to finish.  Then the new concrete floor needs time to cure and, if there is rain, that introduces another delay.  Here are a few photos showing the step-by-step process.

Interlocking Tile

Wire Grid for More Structure

Laying the Concrete

Leave a Comment

Your email address will not be published. Required fields are marked *

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top